Most homeowners can expect a stock or standard security door fitted within a short time when the unit and installer are both available, a common custom or branded mesh door within a few weeks, and a bespoke or out-of-stock design in a longer period. The exact figure depends on the site measure, the material chosen, whether the product needs compliance certification, and how busy the installer is that season.
TL;DR:
- Stock and standard security doors can be installed within a few days to two weeks, especially if a quick replacement is needed after damage or break-ins.
- Custom colours, non-standard sizes, or premium proprietary systems typically extend the timeframe to four to eight weeks due to manufacturing and sourcing requirements.
- Urgent repairs using stock materials can often be completed within one to two days, while full custom replacements require more planning and longer lead times.
- Factors such as material type, compliance certification, seasonality, and supply chain delays significantly influence installation schedules and costs.
- Obtaining a written quote that clearly states the lead time, inclusion details, and warranty coverage is essential to manage expectations and prevent delays.
Table of Contents
- Typical turnaround times by door type and service model
- Factors that affect how long the job takes
- What to expect after you book: the step-by-step scheduling timeline
- Consumer timing rights and practical remedies
- Practical ways to shorten lead time or reduce risk of delay
- How Eastern Security Doors organises fast, compliant turnaround
- Timeline examples showing how turnaround can vary
- Weighing speed against cost and compliance
- Getting your security door fitted without the long wait
- Sources
- FAQ
Typical turnaround times by door type and service model
The fastest outcome is a replacement from stock: if a homeowner needs a door swapped after a break-in or storm damage, some Melbourne suppliers report same-day installation when the unit is already held and an installer has a free slot, though supply-and-install timing more commonly runs from one to two weeks up to six weeks depending on product grade and custom requirements. Emergency repair services sit in this same fast bracket, often using stock frames and temporary hardware to secure a property quickly.
A standard supply-and-install job, where the door is made to the homeowner’s measurements but uses common sizes and stock colours, typically completes within a few weeks. This is the bracket most property managers should plan around for routine replacements.
Premium proprietary mesh systems, sliding configurations and double doors usually add time because they involve more components, extra hardware, and sometimes a second trade visit for alignment. A few points worth noting:
- Stock colours and standard sizes move fastest because no custom cutting or special ordering is needed.
- Sliding and double-door configurations often need extra fitting time for tracks, locks and alignment.
- Repairs (rehanging a door, replacing mesh, fixing a lock) are usually quicker than full replacement because no new frame is manufactured.
- Custom colours or non-standard sizes push jobs into the four to eight week range, particularly for premium systems.
Repairs versus full replacement is worth separating early in any conversation with a supplier, since a damaged mesh panel might be fixed in days while a full frame replacement follows the longer manufacture cycle.
Factors that affect how long the job takes
Several predictable variables explain why one quote promises two weeks and another promises eight. Recognising them helps homeowners compare quotes fairly rather than assuming a longer timeframe means poor service.
- Stock availability: standard sizes and finishes are typically quicker and cheaper, while custom sizes or colours add both cost and weeks to the lead time.
- Material and system type: aluminium grille doors are generally simpler to produce than high-tensile stainless steel woven mesh or premium proprietary systems, which can involve additional manufacturing steps.
- Certification and standards compliance: doors built to AS 5039.1:2023 classification and performance requirements may require documentation or testing that adds a step to production, so it is worth asking a supplier whether compliance checks are pre-tested or performed on-site.
- Seasonality and workload: installers often carry heavier bookings in certain months, which can extend the gap between quote and install date.
- Supply-chain and weather delays: imported components or difficult site access can push manufacture or install dates back.
What to expect after you book: the step-by-step scheduling timeline
Booking a security door sets off a fairly predictable sequence, and knowing the milestones helps a homeowner spot a genuine delay versus normal processing time, as outlined in this step-by-step home owner guide to shutter installation timelines.
- Site measure: a technician visits to take precise measurements and check the opening, door swing and any structural quirks that affect fit.
- Written quote: this should state the lead time, what is included (locks, hardware, disposal of the old door), and who is responsible for installation.
- Manufacture and delivery: the door is built to the measurements taken, then delivered to the installer or site; this window is where most of the elapsed time sits.
- Communication checkpoints: a reliable supplier confirms progress at key points rather than leaving the homeowner to chase updates.
- Install day: expect an arrival window, some prep work on the frame or opening, and a final check of lock alignment and hinge reinforcement.
An install can overrun if the opening needs unexpected adjustment or if hardware supplied on the day does not match what was ordered, which is why confirming inclusions in writing matters. For a closer look at what happens on the day itself, see this installation how-to guide.
Consumer timing rights and practical remedies
When a contract does not specify a completion date, Australian consumer law expects services to be supplied within a reasonable time, and what counts as reasonable depends on the nature of the job, seasonal demand and availability of materials. The ACCC’s consumer guarantees guidance recommends putting concerns in writing and asking for a response within a reasonable period, often around two weeks, before escalating.
Practical steps if a supplier misses an agreed or reasonable lead time:
- Get everything in writing: the quote, the promised lead time and any later changes to that date.
- Set a clear deadline: a written follow-up asking for a response within a stated period, such as two weeks.
- Keep records: dates of contact, replies received and any photos of the unfinished work.
- Escalate if needed: your state consumer affairs office can advise on remedies if the supplier does not respond.
Remedies can include resupply of the service, repair, or in some cases a refund, and a written warranty sits alongside these statutory rights rather than replacing them.
Practical ways to shorten lead time or reduce risk of delay
A few decisions made early in the process consistently shorten the wait. Ordering multiple doors in the same job, for instance, spreads the cost and time of the site measure across units and can meaningfully reduce the per-door timeframe, since a single measure visit is often the biggest fixed time cost in the whole job.
- Stick to standard sizes and stock colours if the calendar matters more than a custom finish.
- Accept a stock mesh option for urgent jobs rather than waiting on a specialty weave.
- Request the lead time in writing in the quote, along with who carries out the installation.
- Ask about express replacement or temporary fixes if the property has an immediate security gap.
Pro Tip: Ask your supplier whether the quoted lead time starts from deposit payment or from the site measure, since the answer can shift your expected install date by a week or more.
How Eastern Security Doors organises fast, compliant turnaround
Eastern Security Doors runs a free on-site consultation and measure before manufacture begins, then handles supply and installation as one coordinated job rather than two separate bookings. Products are built to AS 5039 and AS 5041 compliance, backed by a 10-year warranty and ongoing service and repair support after handover.

Timeline examples showing how turnaround can vary
A homeowner replacing a single damaged aluminium door in a stock colour might see the measure booked within days, manufacture completed within a week, and install scheduled soon after, landing the whole job inside two weeks. A property manager ordering three matching stainless steel mesh doors for a rental block, all in standard sizes, could expect a similar two to three week window per unit because the combined order reduces the time cost of separate measure visits.
By contrast, a homeowner wanting a custom-coloured double door with a premium proprietary mesh system, built to specific AS 5039.1 classification requirements, should expect closer to six to eight weeks once manufacture, hardware sourcing and installation scheduling are factored in. Urgent jobs sit at the other extreme: an emergency repair after a break-in, using stock frames and temporary locks, can often be resolved within a day or two, though this is a different service model to a full custom replacement and usually costs more for the speed. Seasonal demand shifts all three examples up or down, since installers with a full winter or holiday-period calendar will naturally push out both measure and install dates.

Weighing speed against cost and compliance
Speed usually comes at a cost. Stock systems and simple aluminium doors install fastest, while certification checks and bespoke finishes both add weeks to a project. If security is urgent, choose a stock system and ask about express installation rather than waiting on a custom order. For a permanent upgrade, a longer lead time is often the trade-off for the exact colour, mesh type or locking system you want. Whichever path you choose, get the agreed lead time in writing so your supplier can be held to it.
— MYBMC
Getting your security door fitted without the long wait
Some security door companies offer a free on-site consultation and quote, then handle measurement, manufacture and professional installation as one process rather than a string of separate bookings. Doors built to comply with AS 5039 and AS 5041 and backed by a warranty ensure that faster timeframes do not mean cutting corners on standards.

When you request a quote, ask for the lead time in writing, confirmation that installation is included, and details of warranty coverage. You can start with a free consultation on aluminium doors or browse the full range of security doors and screens to compare options before booking your measure.
Sources
- Consumer rights and guarantees | ACCC
- Services took too long | Consumer Affairs Victoria
- AS 5039.1:2023 | Standards Australia Store
- Security Door Cost Calculator (Australia 2026) | Going Rate
FAQ
Is there a cheaper alternative to CrimSafe?
Several brands of stainless steel and aluminium mesh security systems compete on price with premium proprietary products, and standard aluminium grille doors are generally the most affordable option. The right choice depends on your budget, the level of mesh strength you need and how quickly you need the door fitted, since premium systems often take longer to source.
What is the Australian standard for security doors?
Security door and window screens sold and installed in Australia are covered by AS 5039.1:2023, which sets classification and performance requirements, while AS 5039.2 covers installation requirements. Ask any supplier for proof their product and installation meet these standards before you sign a quote.
What is the average price of a CrimSafe door?
Eastern Security Doors does not publish pricing for specific branded systems, and prices vary by supplier, size and finish. For an accurate figure, request a free on-site quote so the cost reflects your exact door opening and chosen materials.
What is the average cost to install a security door?
Costs vary depending on material, size, finish and whether the job is a standard or custom order, and no single published figure applies to every installation. The clearest way to get an accurate number is a written quote, which also confirms the lead time so you know both the cost and the schedule before committing.